Footrail Installation Instructions

|
1.
|
Insert BR504's on tube. Space along tube as required. |
|
2.
|
Attach BR504's to tube: Drill tube using guide holes in BR504. Use #30 jobber bits (available locally at any hardware store, or purchase from Crown Industries). Use self-tapping screws, supplied, to attach brackets to tube.
|
|
3.
|
Attach BR504's (with tubing) to bar: Drill bar using guide holes in BR504. Use woodscrews, supplied, to attach brackets to bar. |
|
4.
|
Attach F205 End Caps to tube: Use one or two drops of glue (Superglue ®, Crazyglue ®, epoxy, etc.) to hold cap. |